-- card: 113238 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Linking to Existing Project -- part 1 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=72 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 2 (button) -- low flags: 00 -- high flags: A003 -- rect: left=17 top=118 right=139 bottom=213 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Link Dialog Box ----- HyperTalk script ----- on mouseUp go card id 108458 end mouseUp -- part contents for background part 31 ----- text ----- Adding & Removing Subprojects -- part contents for background part 32 ----- text ----- Linking to an Existing Project -- part contents for card part 1 ----- text ----- To link a task to an existing project: -- part contents for background part 27 ----- text ----- 1. 2. -- part contents for background part 6 ----- text ----- Select the task (to become the supertask) and choose Link to Subproject from the Task menu. Select the project you want to link to. Important: Do not link to a project that is already a master to the current project. -- part contents for background part 7 ----- text ----- Click Link. Choose Consolidate Project Family from the Dates menu to recalculate the master project’s schedule and costs. -- part contents for background part 28 ----- text ----- 3. 4.